About us · Miami-Dade, Broward, Palm Beach

One contractor, permanent subcontractors and terms you can read before you reach out

Florida Home Build builds custom homes, renovates houses and condos and handles commercial build-outs in Miami-Dade, Broward and Palm Beach, in English, Spanish and Russian.

Modern waterfront house at dusk, with the Miami skyline across the water

About us

Florida Home Build is a Miami general contractor that puts its terms in writing

Florida Home Build is a Miami general contractor for custom homes, turnkey renovation and commercial build-outs. Our office is in Aventura, and we build in Miami-Dade, Broward and Palm Beach counties, in English, Spanish and Russian.

Prices, the maximum price and the four payments are on one page, and the warranty term has its own. We reply to a request within 24 hours.

How the company is set up:

  • One contractor, one contract. A single general contractor signs your contract and answers for every trade on the job.
  • Permanent subcontractors. A permanent group of trades, the same one from project to project.
  • A project manager from the first visit. You meet the project manager before you sign. A superintendent runs the site and confirms the next steps with you every week.
  • Three languages. The whole team speaks English, Spanish and Russian.
  • A visit before any contract. We come to your lot, house, condo or commercial space first and walk through a line-by-line estimate with you.
  • Terms in writing. Cost plus a fixed fee, a maximum price in the contract, four payments and a 3-year warranty with the exclusions listed.

One contractor

What your general contractor handles on a Miami build

A general contractor runs the build so you don't have to hire and coordinate every trade yourself. On our projects the permits, the subcontractors, the inspections and the budget sit with one company, and you talk to one project manager. Here is what that covers.

  • Architectural plans, a property survey and a phone on a desk

    One project manager, one contractPermits, trades, inspections and the budget sit with one company.

  • 01

    Permits and inspections

    City and county permits and local inspections are part of our work. Permitting usually takes 3⁠–⁠6 months on a new home.

  • 02

    Condo and association approvals

    In a condo we prepare the association submissions and plan the work around the elevator and the building's work hours.

  • 03

    Subcontractors and bids

    We work with a permanent group of subcontractors. A line-by-line estimate comes before the contract. After you sign, each subcontractor bid and each change shows up in the shared budget tracker.

  • 04

    Hurricane-zone rules

    Miami-Dade and Broward are generally treated as the High-Velocity Hurricane Zone of the Florida Building Code. Homes in these two counties are designed and built to the HVHZ requirements, and permits and inspections follow them. Read about hurricane-resistant homes

  • 05

    Design and interior

    Design usually takes 6⁠–⁠9 months on a new home, and plans and material selections stay tied to the budget and the price cap. Architect and designer fees sit outside the construction price. If we lead your interior design, the number of revision rounds and the procurement fee are written into the contract up front.

Check us

Where each promise is spelled out

A website can promise anything, so this table points each promise to the page where it is spelled out in full. Read that page, then hold any other contractor to the same level of detail. The pages show the figures we publish, and the answer here is only the short version.

Your questionShort answerRead more
How much will it cost?Price ranges per square foot, then real costs plus a fixed fee under a maximum pricePricing and terms
When do I pay?Four stage payments: at signing, at the start of work, at the midpoint and near completionPricing and terms
What happens after I sign?A superintendent confirms the next steps with you every week, and photos, inspections and invoices are in the client portalHow we build
How long is the warranty?Three years on the work, with the exclusions in the contractWarranty
Can I follow the build from another state?Yes: portal, video at every stage, drone footage and site camerasHow we build

When you are ready to talk about your project, answer 5 questions and we reply within 24 hours.

Get my free estimate

Out of state

Building a house in Miami while you live somewhere else

  • A client portal with the schedule, selections, photos, inspections and invoices
  • Video at every stage and drone footage of the site
  • Cameras on site, so you can look in any day
  • A weekly confirmation of next steps from your superintendent
  • A project manager who speaks English, Spanish or Russian
Talk to a project manager

Projects

The projects Florida Home Build takes on

Projects start at $250,000, and commercial projects are priced individually. We build five kinds of project, and each has a page of its own with the prices, the steps and the questions people ask.

  • A new home on your lot

    From a lot with finished plans or with none, through permits and construction to the certificate of occupancy. Design and permits come first, and the schedule is an estimate, not a promise. See custom home building in Miami.

  • A house renovated down to the studs

    A whole-house remodel with permits and inspections handled by one company and a schedule that is counted from the day permits are issued and materials arrive. See home renovation in Miami.

  • A condo unit

    We prepare the association submission and plan the work around the elevator and the building's work hours. See condo renovation in Miami.

  • A home on the water

    A waterfront or island home in a wind and flood zone, with seawalls and docks built as part of a turnkey project and priced after we see the site. See waterfront construction in Miami.

  • An office, a shop or a restaurant

    Commercial build-outs for offices, retail and restaurants, priced by project. We handle permits and inspections up to the certificate of occupancy. See commercial general contractor work in Miami.

Your money

How a Miami home build works when you're not paying ahead

  • 4 payments, not a big deposit

    At signing, at the start of work, at the midpoint and at about 99% completion. Each payment is for a stage you have approved.

  • A price cap in the contract

    Cost plus a fixed fee, with a maximum price. Savings stay with you. Anything above the cap is paid by the builder.

  • Every bid and invoice in view

    A shared budget tracker shows each subcontractor bid, each change and each invoice.

  • One contractor, one contract

    The same permanent subcontractors on every job, and one company answering for all of them.

  • 3-year warranty, exclusions in writing

    The warranty term is a number in your contract, and so is the list of what it does not cover.

  • An answer in under 24 hours

    By phone, WhatsApp, text or email, in English, Spanish or Russian.

FAQ

Questions about Florida Home Build

Where is Florida Home Build located, and which counties does it serve?

Our office is in Aventura, Florida. We build in Miami-Dade, Broward and Palm Beach counties, and every project starts with a visit to your lot or property before any contract.

What languages does the Florida Home Build team speak?

The whole team speaks English, Spanish and Russian, so your project manager can work with you in any of the three, from the first message to the final walkthrough.

Who actually builds my home?

You sign one contract with one general contractor. A permanent group of subcontractors does the trades, a superintendent runs the site, and the general contractor answers for the whole project.

What kinds of projects does Florida Home Build take?

Custom homes, whole-home and condo renovations, commercial build-outs, and waterfront homes with seawalls and docks as part of a turnkey project. Projects start at $250,000.

How fast does Florida Home Build reply to a request?

We reply within 24 hours of your request, in English, Spanish or Russian. Answer 5 questions about your project, and we get back to you.

Where can I see how Florida Home Build prices a project?

On the pricing and terms page: how costs are capped, when each of the four payments is due and price ranges per square foot by project type.

Can I build a home with Florida Home Build if I live abroad?

Yes. Remote owners follow the build through the client portal, video at every stage, drone footage and site cameras. See how we build.