Home additions · Miami-Dade, Broward, Palm Beach

Add a wing or a second floor to your Miami home, with a price cap in the contract

Turnkey home additions in Miami-Dade, Broward and Palm Beach. Cost plus a fixed fee, a maximum price in the contract, and four payments tied to project stages.

One-story Miami house with a concrete-block second-floor addition under construction, scaffolding and block pallets in front

Home additions

Home additions in Miami, from a new wing to a second floor

Florida Home Build builds home additions in Miami-Dade, Broward and Palm Beach as turnkey projects: a new wing, a second floor, or an addition that comes with a renovation of the rest of the house. You sign one contract, it carries a maximum price, and projects start at $250,000.

Expanding a house means the added space has to tie into the old foundation, roof, electrical panel and air conditioning, and it has to pass the same inspections as the rest of the home.

Our home addition services cover all of it under one contract:

  • City or county permits, every inspection through the final one, and the homeowners' association submission when your community requires it.
  • Foundation, framing and the roof tie-in where the new structure meets the existing home.
  • Electrical, plumbing and HVAC for the added square footage, including panel and air-conditioning capacity.
  • Windows, doors and roofing that meet the hurricane-zone code in Miami-Dade and Broward.
  • Interior and exterior finishes, from flooring and paint to the new exterior walls and roofline.
  • One project manager who confirms the next steps every week, with photos and inspection results in your client portal.

Every project starts with a visit to your property, before any contract. After it you get a line-by-line estimate.

Your money

How a Miami home build works when you're not paying ahead

  • 4 payments, not a big deposit

    At signing, at the start of work, at the midpoint and at about 99% completion. Each payment is for a stage you have approved.

  • A price cap in the contract

    Cost plus a fixed fee, with a maximum price. Savings stay with you. Anything above the cap is paid by the builder.

  • Every bid and invoice in view

    A shared budget tracker shows each subcontractor bid, each change and each invoice.

  • One contractor, one contract

    The same permanent subcontractors on every job, and one company answering for all of them.

  • 3-year warranty, exclusions in writing

    The warranty term is a number in your contract, and so is the list of what it does not cover.

  • An answer in under 24 hours

    By phone, WhatsApp, text or email, in English, Spanish or Russian.

Cost

Home addition cost in Miami by type of addition

Miami contractors quote home additions per square foot of new space, and two of them publish about $300⁠–⁠550 per sq ft for 2026. That is what contractors publish, not our quote. Your number comes after we see the house and the plans.

Type of additionWhat you getPublished range, one Miami contractor, 2026What moves the price
Room or wing at ground levelA bedroom suite with a bathroom, a family room, or a kitchen and living wing$150,000⁠–⁠450,000 for a room additionFoundation, electrical panel, a second A/C system, the roof tie-in
Second storyA new floor over the existing rooms$300,000⁠–⁠800,000+Strengthening the first floor ($40,000⁠–⁠120,000 in the same estimates), the stairs, hurricane-code windows
Florida room or enclosed porchA bright room off the back of the houseSet after we see the plansThe slab, glass and doors, and whether it is air-conditioned living space
Garage turned into a roomA bedroom, office or laundry room in the old garageSet after we see the plansAir conditioning, wall and floor finishes, the former garage door opening
Addition with a whole-house renovationA new wing and updated old rooms under one contractRenovation part, market figure: $50⁠–⁠250 per sq ft, most often $75⁠–⁠150The scope of the renovation and the finishes you pick

Check early

Two line items are worth checking early. One Miami contractor estimates a new 200-amp electrical panel at $4,000⁠–⁠8,000, plus $3,000⁠–⁠6,000 for the utility side, and a second air-conditioning system at $8,000⁠–⁠18,000.

One contract

As on our other projects, architect and designer fees, permits and surveys are priced separately from construction. We act as your general contractor on the whole job, so the addition and the work on the old rooms share one contract.

Start my estimate

Out of state

Building a house in Miami while you live somewhere else

  • A client portal with the schedule, selections, photos, inspections and invoices
  • Video at every stage and drone footage of the site
  • Cameras on site, so you can look in any day
  • A weekly confirmation of next steps from your superintendent
  • A project manager who speaks English, Spanish or Russian
Talk to a project manager

Permits

Permits, flood zones and hurricane rules for a home addition in Miami

Every home addition in Miami-Dade needs a building permit, and the permit comes with three sets of rules that shape the design: zoning, FEMA flood maps and the hurricane code. As your home addition contractor, we handle the applications and inspections.

Permits and plans

Complex projects can require plans signed and sealed by an architect or engineer, and the zoning review checks setbacks, height and landscaping. In most cities the city's own building department issues the permit, and in unincorporated areas the county does. If your community has a homeowners' association, we prepare its submission too.

Lot coverage and setbacks

Zoning decides how much you can build. In unincorporated Miami-Dade's RU-1 single-family district, for example, a lot is at least 7,500 sq ft and buildings can cover up to 40% of it. Local regulations and local building codes differ by city, and individual lots can be stricter, so the limits of your own lot set the size of the addition.

Flood zones and the 50% rule

In a FEMA flood zone, work that costs 50% or more of the market value of the house itself, land excluded, counts as a substantial improvement. The new part always has to meet flood rules. For a ground-level wing that leaves the old house mostly alone, that generally means raising only the new part. A second story, a removed shared wall or a V zone can bring the whole house up to current flood rules, and local rules can be stricter. The city or county runs the calculation. Our whole-house renovation cost guide covers the rule in more depth.

Hurricane-zone requirements

Miami-Dade and Broward sit in the High-Velocity Hurricane Zone of the Florida Building Code. The windows, doors, shutters and roofing materials of the new space need county product approval, and the approval goes in with the permit application. In Miami-Dade, applications filed on or after December 31, 2026 follow the 9th edition of the code, which matters if your design is still in progress. More in our guide to hurricane-resistant homes.

After the keys

A 3-year home builder warranty and a full handover

House keys on a folder of handover documents
  • 01

    3-year warranty on the work

    The term and the list of exclusions are written in your contract, not explained later.

  • 02

    Handover package

    As-built drawings, manuals, a maintenance schedule and manufacturer warranties registered in your name.

  • 03

    A walkthrough of every system

    We walk the house with you and show how each system works before you move in.

  • 04

    Care after move-in

    Home maintenance by arrangement, with the same team that built it.

FAQ

Questions about home additions in Miami

How much does a home addition cost in Miami?

Our turnkey projects start at $250,000, with a maximum price in the contract. For comparison, two Miami contractors publish about $300⁠–⁠550 per sq ft of new space, and one lists $150,000⁠–⁠450,000 for a room and $300,000⁠–⁠800,000+ for a second story. Those are not our quote. We price your addition after we see the house and the plans. Every type is in the table above.

Is a ground-level home addition cheaper than building up?

One Miami contractor's published totals are higher for a second story than for a ground-level room, though the areas differ. Part of the gap is that the first floor may need strengthening. A ground-level wing needs room on the lot after setbacks and lot coverage. Your lot and the structure of your house decide it.

Can you build a second-story home addition on my house?

An engineer has to confirm that the foundation and walls can carry another floor, and the new floor has to meet the hurricane code. We build second floors as part of turnkey projects that start at $250,000.

What permits do I need for a home addition in Miami?

A building permit from your city or, in unincorporated areas, the county, with signed and sealed plans when the project is complex. We handle the applications, the association submission if you have one, and every inspection.

What is the FEMA 50% rule for an addition?

In a FEMA flood zone, an addition that costs 50% or more of the house's market value, land excluded, is a substantial improvement, and the city or county runs the calculation. Our renovation cost guide covers the rule in more depth.

How long does a home addition take in Miami?

One Miami contractor publishes about 7⁠–⁠11 months for a room addition and 9⁠–⁠15 months for a second story. That is not a promise from us. Dates for your project are estimates: permit queues, inspections and rain move them, and you see every change in your client portal that week.

How are payments handled on a home addition?

You pay in four steps: at signing, at the start of work, at the midpoint and at about 99% completion, with the shares set in your contract. The contract is cost plus a fixed fee with a maximum price, and we pay anything above it.

Can I turn my garage into a room instead of building an addition?

Yes. A garage turned into living space is one more way to add rooms, and we build it as part of a turnkey project from $250,000. Miami rules, costs and steps are on our garage conversion page.

Didn't find your answer? A project manager replies within 24 hours.Get my price range