General contractor in North Miami · Miami-Dade, Broward, Palm Beach
Cost plus a fixed fee with a price cap, four payments tied to approved stages and a 3-year warranty on the work. The permits and inspections are ours to run.
North Miami
A general contractor in North Miami holds one contract for the whole project and runs the permits, the subcontractors and the inspections. Florida Home Build does that for three kinds of work: a new house on your lot, a teardown followed by a new house, and a major renovation of a house or a condo unit, with budgets usually starting at $250,000.
Looking for new construction homes in North Miami? You bring the land, or the old house standing on it, and we build the new one there, to your plans. North Miami is a city of its own on Biscayne Bay in Miami-Dade County, and two lots a few blocks apart can differ: one on dry ground, one on a canal, one inside a flood zone. We find out which case yours is before we price anything. A North Miami project with us comes with:
What comes with it
North Miami Beach is a different city with its own building division. Lots there are also in Miami-Dade County, our service area.
Out of state
Lot check
On a North Miami lot, four things set the plan before the first drawing is made: the city’s Building Department and its zoning, the flood zone, the wind code and, on a canal lot, the water itself. Each one can change the floor height, the structure or the budget, so we look at them first.
The department is at 12340 NE 8th Ave and, according to the city’s website, is open Monday to Friday, 7:30 a.m. to 3:30 p.m. The same website lists online services for permits and inspections and an interactive Zoning Code and Zoning Map, so you can check the zoning of your lot before you design. On our projects we handle the permits and inspections.
A project in a special flood hazard area has to show compliance with Chapter 8.5 of the city’s Code of Ordinances, and the city says an Elevation Certificate and a Floodplain Development Permit may be required. For a remodel, FEMA counts work worth 50% or more of the building’s market value, land excluded, as a substantial improvement, and in an AE zone the lowest floor is then raised to the base flood level, which changes the structure and the budget. We ask for the certificate first and plan the floor height around it.
Miami-Dade is in the high-velocity hurricane zone of the Florida Building Code. The roof, windows and exterior doors are designed to that standard, and windows and doors carry the county’s product approval (NOA) before they go in. Our storm-resistant homes page goes through it.
Real estate guides describe Keystone Point as mostly detached houses on canals that lead to Biscayne Bay. On any canal lot we check the seawall, the flood zone and the floor height at the start, because they shape the plan, the schedule and the budget, and the condition of a seawall is something we look at on site, not assume.
Aventura and Miami Beach have their own pages. For the water side, see waterfront construction and the seawall contractor page, and for the permit side, permit expediting.
Check my North Miami lotYour money
At signing, at the start of work, at the midpoint and at about 99% completion. Each payment is for a stage you have approved.
Cost plus a fixed fee, with a maximum price. Savings stay with you. Anything above the cap is paid by the builder.
A shared budget tracker shows each subcontractor bid, each change and each invoice.
The same permanent subcontractors on every job, and one company answering for all of them.
The warranty term is a number in your contract, and so is the list of what it does not cover.
By phone, WhatsApp, text or email, in English, Spanish or Russian.
Costs
Prices in our South Florida ranges are per square foot, and they depend on the lot and the scope. For an investment of $250,000 and up, we show the numbers before you commit. The new-house ranges come from homes of about 6,000–8,000 square feet, not from a quote for North Miami, and the number you can plan around comes after we see your lot and plans.
The price covers the build. Land, architect and designer fees, permit fees, surveys, furniture and landscaping come separately, and the estimate shows what is in and what is not. A new house usually takes 28–36 months from the first meeting to move-in, counting design, permits and construction; a condo unit usually takes 3–8 months. These are estimates, not promises. The pricing and terms page has the detail, and two articles go further: how much it costs to build a house in Florida and what a seawall costs.
After the keys

The term and the list of exclusions are written in your contract, not explained later.
As-built drawings, manuals, a maintenance schedule and manufacturer warranties registered in your name.
We walk the house with you and show how each system works before you move in.
Home maintenance by arrangement, with the same team that built it.
FAQ
No. They are two separate cities in Miami-Dade County, and each has its own building department. Send us the address and we confirm which city issues the permit for your lot. We work in both, as part of Miami-Dade.
You pay the actual cost of labor and materials plus a fixed fee, and the contract sets a price cap: if costs run above it, the contractor pays the difference. Our projects usually start at $250,000, the fee is fixed in the contract, and the per-square-foot ranges are in the table above. The article on general contractor fees in Florida explains the model.
For a lot inside the City of North Miami, the permit is issued by its Building Department. On our projects we prepare and file the paperwork and run the inspections, and the city’s fees come on top of the construction price.
Yes. North Miami is in our Miami-Dade service area, and a canal lot is priced in the $900–1,300 per square foot range above. Before that we check the seawall, the flood zone and the floor height, so the plan fits the lot. Send us the address and we tell you what the lot needs.
It depends on the cost of the work. When it reaches 50% of the building’s market value, land excluded, the work counts as a substantial improvement, and in an AE zone the lowest floor is then raised to the base flood level. The Elevation Certificate comes first, and the building department confirms the figures.
Yes, as a full remodel of a unit, usually 3–8 months. A condo building has its own rules for contractors, and many ask for an application or a letter from the association before work starts. We prepare the application, and the permits and inspections run through us. The condo remodeling page has the detail.
Usually 28–36 months from the first meeting to move-in, counting design, permits and construction. That is an estimate, not a promise. The article on how long a custom home takes breaks it down by phase.