Custom homes · Miami-Dade, Broward, Palm Beach

Build a custom home in Miami with a maximum price in your contract

Custom homes on your lot in Miami-Dade, Broward and Palm Beach. You pay the actual cost plus a fixed fee, the contract sets the ceiling, and four payments follow the stages you approve.

Two-story concrete block custom home under construction on a South Florida lot, with formwork, shoring and pallets of blocks

Custom homes

Custom home builders in Miami with one contract and a maximum price

Florida Home Build builds custom homes on your lot across Miami-Dade, Broward and Palm Beach, with one general contractor and the same subcontractors on every project. Among custom home builders in Miami, that means one company answers for the house from the permits to move-in. Where you begin depends on what you already have in hand.

  • A lot and finished plans: we file the permits and build the construction schedule around your drawings, so the estimate you sign rests on your actual plans.
  • A lot and no plans yet: a budget comes first, then design. Architectural plans and designer fees are billed separately from construction.
  • Owners who will oversee the build from another state or country: the client portal, video and a weekly confirmation of next steps keep you in the picture whatever the distance.

Design is tied to the budget from the start, and material selections are priced into the same line-by-line estimate that comes before the contract.

Every project starts with a visit to the property. The locations we build in cover South Florida, from Coral Gables and Doral to Fort Lauderdale, Weston, Boca Raton and Jupiter, and the project manager speaks English, Spanish or Russian.

Your money

How a Miami home build works when you're not paying ahead

  • 4 payments, not a big deposit

    At signing, at the start of work, at the midpoint and at about 99% completion. Each payment is for a stage you have approved.

  • A price cap in the contract

    Cost plus a fixed fee, with a maximum price. Savings stay with you. Anything above the cap is paid by the builder.

  • Every bid and invoice in view

    A shared budget tracker shows each subcontractor bid, each change and each invoice.

  • One contractor, one contract

    The same permanent subcontractors on every job, and one company answering for all of them.

  • 3-year warranty, exclusions in writing

    The warranty term is a number in your contract, and so is the list of what it does not cover.

  • An answer in under 24 hours

    By phone, WhatsApp, text or email, in English, Spanish or Russian.

Cost

What a custom home costs in Miami, and what the price leaves out

Construction of a custom home in Miami runs $450⁠–⁠650 per square foot on a mainland lot, $900⁠–⁠1,300 on the water or on an island, and $1,300⁠–⁠1,800+ on the ocean. The lot decides the range first, and your exact number depends on the size of the house and comes after we see the lot and the plans. The construction price covers a new home on your lot through to the certificate of occupancy.

LotConstruction price per sq ft
Mainland lot$450⁠–⁠650
Waterfront or island lot$900⁠–⁠1,300
Oceanfront lot$1,300⁠–⁠1,800+

The construction price does not include:

  • 01the lot itself;
  • 02architect and designer fees;
  • 03permit fees, surveys and impact fees;
  • 04furniture;
  • 05landscaping.

Keep these five lines in your budget next to the construction price. The line-by-line estimate that comes before the contract shows where each of them lands.

When you compare builders in the Miami market, check that each number covers the same scope: ours ends at construction. For the wider picture, see our guide to what it costs to build a house in Florida.

Start my estimate

Timeline

How long it takes to build a custom home in Miami

  1. Strategy, lot and budget2⁠–⁠3 months

    A site visit before any contract, a line-by-line estimate and a meeting with your project manager.

  2. Design6⁠–⁠9 months

    Plans and selections, tied to the budget and the price cap.

  3. Permits3⁠–⁠6 months

    City and county permits, inspections and association submissions are on us.

  4. Construction16⁠–⁠22 months

    Your superintendent confirms the next steps every week, with photos and inspections in your client portal.

Usually 28⁠–⁠36 months from the first meeting to move-in. These are estimates, not promises: rain, inspections and permit queues move dates, and you see every change in the portal the week it happens. On average the build takes 2⁠–⁠4 hours of your time per week.

Get a timeline for my lot

Out of state

Building a house in Miami while you live somewhere else

  • A client portal with the schedule, selections, photos, inspections and invoices
  • Video at every stage and drone footage of the site
  • Cameras on site, so you can look in any day
  • A weekly confirmation of next steps from your superintendent
  • A project manager who speaks English, Spanish or Russian
Talk to a project manager

Permits and codes

How Miami permits and building codes shape a custom home

Miami-Dade and Broward make up the High-Velocity Hurricane Zone (HVHZ) of the Florida Building Code, and Palm Beach County sits outside it. A custom home in the zone is designed to HVHZ requirements before anyone applies for a permit. We file the city and county permits, run the inspections and prepare any homeowners association submission.

Windows, doors and roofing need county approval

In Miami-Dade, windows, exterior doors, shutters and other products of a residence's building envelope need county product approval and carry a Notice of Acceptance (NOA). A copy of the NOA goes in with the permit application, so these selections belong to the design phase, not the finishing phase. More on this in our guide to storm-resistant houses in Florida.

A new edition of the code arrives on December 31, 2026

The 9th edition of the Florida Building Code takes effect on December 31, 2026. In Miami-Dade, permit applications and plans submitted on or after that date must follow it.

Impact fees depend on the city

In Miami-Dade, road and school impact fees are paid to the county, and so is the fire impact fee, except in Miami, Miami Beach, Hialeah, Coral Gables and Key Biscayne. These fees sit outside the construction price, so they belong in your budget next to the permit fees.

After the keys

A 3-year home builder warranty and a full handover

House keys on a folder of handover documents
  • 01

    3-year warranty on the work

    The term and the list of exclusions are written in your contract, not explained later.

  • 02

    Handover package

    As-built drawings, manuals, a maintenance schedule and manufacturer warranties registered in your name.

  • 03

    A walkthrough of every system

    We walk the house with you and show how each system works before you move in.

  • 04

    Care after move-in

    Home maintenance by arrangement, with the same team that built it.

FAQ

Questions about building a custom home in Miami

What is the average cost per square foot to build a custom home in Miami?

There is no single average, because the lot sets the range: $450⁠–⁠650 per square foot on a mainland lot, $900⁠–⁠1,300 on the water or on an island, and $1,300⁠–⁠1,800+ on the ocean. The lot, design fees, permits, furniture and landscaping come on top, as the table above shows. Estates and mansions have their own page on luxury custom homes in Florida.

Is $300,000 enough to build a custom home in Miami?

It depends on the lot, the size of the house and the plans, so we can't say yes or no in advance. Construction is estimated per square foot, and then the contract sets the actual cost plus a fixed fee under a maximum price. The lot, design, permits and fees are separate. Projects start at $250,000; answer 5 questions about your lot and budget, and a project manager replies within 24 hours.

How long does it take to build a custom home in Miami?

Usually 28⁠–⁠36 months from the first meeting to move-in, and construction itself takes 16⁠–⁠22 of them. These are estimates, not promises: inspections and permit queues move dates. The timeline above breaks it down by phase, and our guide to how long it takes to build a custom home in Florida goes deeper.

Do you build custom homes outside Miami, in Broward and Palm Beach?

Yes. We work in three counties: Miami-Dade, Broward and Palm Beach. Areas with their own pages include Fort Lauderdale, Palm Beach, Miami Beach and Star Island.

How do I build a custom home on my own lot in Florida?

The order is design, permits, site preparation and construction, and some phases overlap. You bring the lot and a budget, and plans if you have them; we file the permits and run the build. The step-by-step path from an empty lot is on our page for new home builders in Miami.

Do I need an architect before I call a custom home builder?

You can come with finished plans or with only a lot. Architect and designer fees are separate from the construction price, so they belong in your budget either way.

What should a custom home contract in Florida include?

Florida law (section 489.1425) requires a statement about the Florida Homeowners' Construction Recovery Fund in residential construction contracts above $2,500. Beyond that, look for the price rules and the payment stages: in ours, cost plus a fixed fee with a maximum price, four payments for approved stages, and a 3-year warranty with its exclusions in writing. How contractors get paid is covered in this guide.

Which architectural styles can a custom home follow?

Florida homes follow several styles, and each has its own page on this site: modern and contemporary, Mediterranean, Key West and coastal, Victorian and colonial.

Didn't find your answer? A project manager replies within 24 hours.Get my price range