Star Island builders · Miami-Dade, Broward, Palm Beach

A Star Island build under one contract, with a price cap and four stage payments

New homes and major remodels on Miami Beach waterfront lots. Cost plus a fixed fee with a price cap, a 3-year warranty on the work, and the permits and association filings handled by us.

Concrete frame of a large two-story villa under construction on the Biscayne Bay waterfront, seen from the water, with a tower crane, a new concrete seawall, a hedge and royal palms, and high-rises in the distance

Star Island

Star Island builders in Miami Beach for new custom homes and major remodels

Star Island builders put up new custom homes and carry out major remodels on waterfront lots in Miami Beach. Florida Home Build does both under one contract, with the permits, the inspections and the subcontractors in one set of hands, with project budgets usually starting at $250,000.

Star Island is a man-made island in Biscayne Bay, part of the city of Miami Beach and reached by the MacArthur Causeway. The Army Corps of Engineers finished it in 1922 by dredging sand from the bay. A Star Island project with us includes:

  • A free initial estimate before you commit.
  • A new custom home on your parcel, or a major remodel of the house that stands there, as one turnkey project.
  • Permit applications, inspections and association filings, prepared and handled by us.
  • Cost plus a fixed fee with a price cap, so the contractor pays anything above the cap.
  • Four payments, each tied to an approved stage of the work.
  • One contractor with steady subcontractor crews, a client portal and a weekly confirmation of the next steps from your superintendent.

We work across South Florida, in Miami-Dade, Broward and Palm Beach counties, and our team speaks English, Spanish and Russian. We reply to a request within a day, and the owner's part of a build usually takes 2⁠–⁠4 hours a week.

Timeline

How long it takes to build a custom home in Miami

  1. Strategy, lot and budget2⁠–⁠3 months

    A site visit before any contract, a line-by-line estimate and a meeting with your project manager.

  2. Design6⁠–⁠9 months

    Plans and selections, tied to the budget and the price cap.

  3. Permits3⁠–⁠6 months

    City and county permits, inspections and association submissions are on us.

  4. Construction16⁠–⁠22 months

    Your superintendent confirms the next steps every week, with photos and inspections in your client portal.

Usually 28⁠–⁠36 months from the first meeting to move-in. These are estimates, not promises: rain, inspections and permit queues move dates, and you see every change in the portal the week it happens. On average the build takes 2⁠–⁠4 hours of your time per week.

Get a timeline for my lot

Miami Beach review

What Miami Beach reviews before a Star Island house is built

A new Miami Beach house that meets the zoning and design requirements is approved by city staff and does not go to the Design Review Board. The Board hears a project when the plans request waivers or variances, or when the house has an understory. Which path yours takes depends on the design.

Design review: staff or the Board

The Board reviews the architecture of applications that need design review outside historic districts. Every waiver, variance or understory in the design adds a hearing, and a hearing is a step in the schedule.

A survey with flood data

The city's single-family checklist asks for a survey not older than one year that shows the base flood elevation and the grade. The facade drawings then show the base flood elevation, grade, adjusted grade and, where it applies, freeboard. Order the survey first, because the drawings are built on it.

Grading, landscape and trees

The same checklist asks for a grading plan, a future adjusted grade, a landscape plan with irrigation and a tree survey. On a bayfront parcel, drainage and planting belong to the permit set, not to the end of the project.

Historic status

If the property sits in a historic district or is designated historic, a Certificate of Appropriateness is required. The Historic Preservation Board or Planning Department staff issues it: staff clear many small works, and a full demolition goes to the Board. Ask the city about the status of a parcel before you buy it.

An Elevation Certificate for new construction

Miami Beach requires a FEMA Elevation Certificate for every new building and every substantial improvement. We include the certificate in the permit schedule.

The checklist we describe is the city's 2023 edition, and rules change, so confirm the current version with Miami Beach Planning before you design. How we run filings is on the permit expediting page, and the rest of the city is covered on the Miami Beach general contractor page.

Check my Star Island lot

After the keys

A 3-year home builder warranty and a full handover

House keys on a folder of handover documents
  • 01

    3-year warranty on the work

    The term and the list of exclusions are written in your contract, not explained later.

  • 02

    Handover package

    As-built drawings, manuals, a maintenance schedule and manufacturer warranties registered in your name.

  • 03

    A walkthrough of every system

    We walk the house with you and show how each system works before you move in.

  • 04

    Care after move-in

    Home maintenance by arrangement, with the same team that built it.

On the lot

The old house, the wind code, the seawall and the dock on a Star Island lot

A coastal house on Biscayne Bay depends on four things beside the drawings: the older building on the lot, the county's wind rules, the seawall and dock, and the way materials reach the site. The steps below go through them.

  1. The older house and the 50% rule

    In a flood zone, an improvement or damage that costs 50% or more of the building's market value, land excluded, brings the lower floor up to current requirements. Ask the city for the calculation before you decide how far a remodel goes.

  2. The wind code

    Miami Beach lies in Miami-Dade County, which is in the high-velocity hurricane zone, so the structure and its openings are designed to those rules. Storm-resistant houses in Florida explains what that means for walls, glass and roofs.

  3. The seawall and the dock

    Check the wall's age, condition and top height at the start. Miami Beach sets minimum heights for new seawalls by ordinance, and the city amended it in 2025; and the exact number for your parcel comes from the city, not from a rule of thumb. A wall that needs replacing changes both the budget and the order of work, and a private dock is checked together with it.

  4. Access logistics and staging

    Deliveries and material staging go into the construction schedule, and we agree access with the island's security and association before work starts.

Seawall scope and market ranges are on the seawall contractor page, how the shore side joins the house is on waterfront construction, and the article on seawall cost in Florida compares vinyl, concrete and steel.

Send my Star Island lot

Out of state

Building a house in Miami while you live somewhere else

  • A client portal with the schedule, selections, photos, inspections and invoices
  • Video at every stage and drone footage of the site
  • Cameras on site, so you can look in any day
  • A weekly confirmation of next steps from your superintendent
  • A project manager who speaks English, Spanish or Russian
Talk to a project manager

FAQ

Questions about building on Star Island

Does a new house on Star Island need Design Review Board approval?

Not always. A new single-family house that meets the zoning and design requirements is approved administratively in Miami Beach. The Board reviews it when the plans request waivers or variances, or when the house has an understory.

What permits and documents does Miami Beach require for a new Star Island home?

The city's planning checklist asks for a zoning data sheet, a survey with flood data not older than one year, facade elevations, landscape and tree plans and a grading plan. A FEMA Elevation Certificate is required for new construction. On our projects we prepare and file the applications and handle the inspections.

How high must the first floor of a Star Island home be on a waterfront lot?

It depends on the flood zone, the base flood elevation on your survey and the rules in force when you apply, so we do not quote one number. The city asks for the elevations on the plans and an Elevation Certificate. Order the survey early, because it sets the floor height.

Is Star Island in the high-velocity hurricane zone?

Miami Beach is in Miami-Dade County, and the county is in the high-velocity hurricane zone of the Florida Building Code. A Star Island house is therefore designed to those rules, and windows and doors are generally specified with approval for that zone. The page on storm-resistant houses gives the details.

Who agrees site access for a Star Island build?

The island is reached by the MacArthur Causeway. Before work starts, we agree access for crews and deliveries with the island's security and association, and we build the delivery plan into the schedule.

How much does it cost to build a custom home on Star Island?

Our starting point for a new house on the water and on islands is $900⁠–⁠1,300 per square foot. It comes from large homes and is not a quote for Star Island. The land, the design, permits and fees, furniture and landscaping sit outside it, and projects usually start at $250,000. See pricing and terms and the article on what it costs to build a house in Florida.

How long does it take to build a custom home on Star Island?

A new house usually takes 28⁠–⁠36 months from design start to move-in, counting design, permits and construction. These are estimates, not promises: design review, the permit queue, the seawall and site access set the real timeline. The article on how long a custom home takes breaks down each phase.

Can you remodel an existing house on Star Island?

Yes, major remodels run under the same contract as new builds. In a flood zone, work that costs 50% or more of the building's value, land excluded, brings the lower floor up to current requirements, so ask the city for that calculation first. Since June 26, 2025, Florida law bars cities in the flood insurance program from adding up improvements over a set period. Ask the city how it counts your project.